9F Module

- Tunisia
CMI RADES PROJECT 9F Grade HRSG, designed with 4 modules deep and 3 modules width, in total 12 modules, 83 harps. The maximum weight of sigle module is 350 tons, height is 5 meters.
Highest material is P/T91, and there are also TP347H, TP321H material.
Total tube quantity is 14000 pieces, there are in toatl more than 28000 tube and header welds, all of them are full penetration type with 100% boroscope insepction per CMI's requirement.
9F Module
CMI RADES PROJECT 9F Grade HRSG, designed with 4 modules deep and 3 modules width, in total 12 modules, 83 harps. The maximum weight of sigle module is 350 tons, height is 5 meters.
Highest material is P/T91, and there are also TP347H, TP321H material.
Total tube quantity is 14000 pieces, there are in toatl more than 28000 tube and header welds, all of them are full penetration type with 100% boroscope insepction per CMI's requirement.